Production

26 Wirebonding

25 Placement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Our white room

Class 10,000 (300 m²)
Phase automated assembly / A minimum of manual operations
Precision assembly of components and RF subsrate
Industrialization (Cpk 1.6 – 2 for critical operations)
Operations Team

 

 

27 Deverminage

28 Banc Test

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Our grey room

Class 100,000 (380 m²)
Assembling mixed manual / automatic
DFM / Poke Yoke methodologies
2 assembly lines: AC10 and AC20 with a phase welding shared
Calibration and Testing
Operations Team